Safe Work Method Statement DOC


  • /wps/wcm/connect/7714c7804071f76dbf40ffe1fb554c40/SWMS+template.doc?MOD=AJPERES
    Document Type: Education Material
    Industry: Construction, 
    Category: General, 
    Division Author: Construction
    Date First Published: 15 February 2008
    Summary: This SWMS is a site-specific statement that must be prepared before any high-risk construction work is commenced.

This Safe Work Method Statement is a site-specific statement that must be prepared before any high-risk construction work is commenced.

This form is also available in a PDF version.