Fix

Work through the following list to control mining risks. In many instances, a combination of approaches will result in the best solution.

1. Eliminate the cause of the risk

The best option is to remove the hazard completely, so you should always try to do this first.

2. Substitute or isolate the hazard, or use engineering controls

If you can’t remove the hazard, think about changing the work to involve a lesser hazard, separating the hazard from people or using engineering controls. 

Example: Install emergency stop equipment.

3. Use administrative controls

If there is still a risk, reduce it by changing the way the work is done.

Example: Develop performance standards for conveyors and the testing of components to ensure reliability of conveyor systems.

4. Provide personal protective equipment (PPE)

If no other measures will totally solve the problem, use PPE to reduce the risk.

Example: Provide respirators where necessary.