What it contains
Construction work that involves putting up tilt-up or precast concrete is defined as high risk construction work (HRCW) and must follow a prepared safe work method statement (SWMS). This checklist can help workplaces manage health and safety risks, and can be included as part of a SWMS. It explains:
- background on tilt-up or precast concrete and how this is used in construction
- control measures to reduce or eliminate workplace health and safety risks
- how to use a checklist to address all health and safety risks