Falls while working at height remains the most serious risk associated with solar panel installations, so it is crucial to assess all risks and plan a safe approach to the installation.
This document outlines the four-step risk management process including:
Identifying hazards
Assessing risks
Controlling the risks
Reviewing and revising the controls
Related information
WorkSafe Victoria
WorkSafe Victoria
This overlay title is for smaller device. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt