Performance standards and indicators

How to develop performance standards for a safety management system (SMS) at a major hazard facility (MHF).
Last updated

Dec 2019

Reading level

difficult

File Type and Size

PDF, 194.88 kB

Document Length

20 pages

What it contains

This guidance note provides advice for operators of major hazard facilities (MHF) to develop performance standards and indicators for a safety management system (SMS) at the facility. It explains:

  • how to monitor performance
  • which measures are needed
  • how to monitor performance measures and consult with employees and health and safety representatives
  • performance indicators for control measures, including how to test their successes and failures
  • examples of performance measures
  • performance standards for SMS
  • a compliance checklist for control measures